1. Basic specifications specifications
模型
ZSW: heavy-duty vibrating feeder (Z vibration, S double-shaft, W grate type)
1142: trough width 1140mm, length 4200mm
Grid screen gap: 50-150mm (customizable, used for pre-screening of bulk materials) Maximum feed particle size: ≤600mm (within 1.5 times the grate gap)
Processing capacity: 200-600 tons/hour (related to material density and moisture content)
2.Power and vibration parameters
振动电机:
Model: YZD206 (2 units) Power: 2×7.5kW (380V,50Hz)
Exciting force: 2×60kN (adjustable eccentric block to adjust the amplitude)
Vibration frequency: 700-1000 times/ minute
Amplitude: 48mm (double amplitude)
3.结构设计
Trough material:
Mainboard: Q345B Steel plate(thickness 1216mm)
Grate bars: high manganese steel(Mn13Cr2) or wear-resistant alloy steel (lifespan 6-12 months) Vibration reduction device: rubber spring or composite spring (reduces basic load)
Inclination adjustment:0°-15° (hydraulic or manual adjustment to adapt to different working conditions)
4.Applicable materials
Mines: granite, iron ore, limestone and other raw ores
Preliminary screening of sand and gravel aggregates: uniform feeding +pre-screening before the crusher Others: coal mines, metallurgical slag and other block materials
5. Equipment size and weight Overall dimensions (length × width × height):
≈4800mm×1800mm×1500mm (including motor frame)
Machine weight: about 58 tons (depending on material and configuration)
6.Special configuration (optional)
Anti- blocking design:
Grate heating device (to prevent wet materials)
High-pressure water flushing system (for materials with high clay content)
智能控制:
Variable frequency speed regulation motor (automatically adjusts the feed amount according to the crusher load) Blockage alarm sensor (interlocked with the production line to shut down)
要点
1. Selection points:
For wet materials (water content > 10%), the grate gap needs to be increased or a vibrator needs to be added. For high-hardness ores (such as basalt), alloy steel grates are recommended.
2.安装要求:
The foundation level deviation is ≤2mm/m, and the pre-buried steel plate is used to prevent loosening. The discharge port and the crusher feed port should maintain a drop of 200-300mm.